Carnival Corporation & plc has signed a multi-billion dollar contract with German shipbuilder Meyer Werft to build four next-generation cruise ships with the largest guest capacity in the world.
The contract is part of larger previously announced strategic memo of understanding with leading shipbuilders Meyer Werft and Fincantieri S.p.A for nine new ship orders between 2019 and 2022.
The four new ships, featuring a revolutionary “green cruising” design, will be the first in the cruise industry to be powered at sea by Liquefied Natural Gas (LNG) — the world’s cleanest burning fossil fuel, representing a major environmental breakthrough.
The company said two of the ships will be manufactured for AIDA Cruises at Meyer Werft’s shipyard in Papenburg, Germany. Additional information about the ships, including which new ships will be added to each brand, will be made available at a later date.
In addition to the two ships being built in Germany, Meyer Werft will also build the two additional ships at its shipyard in Turku, Finland.
Each of the four next-generation ships will have a total capacity of 6,600 guests, feature more than 5,000 lower berths, exceed 180,000 gross tons and incorporate an extensive number of guest-friendly features.
Carnival said that a major part of the innovative design involves making much more efficient use of the ship’s spaces, creating an enhanced onboard experience for guests.
The four new ships will be the first in the cruise industry to use LNG in dual-powered hybrid engines to power the ship both in port and on the open sea. LNG will be stored onboard and used to generate 100 percent power at sea – producing another industry-first innovation for Carnival Corporation and its brands. Using LNG to power the ships in port and at sea will eliminate emissions of soot particles and sulfur oxides.
Carnival Corporation CEO Arnold Donald said the contract is consistent with the company’s measured capacity growth strategy to replace ships with less efficient capacity with newer, larger and more fuel efficient vessels over time.
“We are looking forward to executing on the next step in our fleet enhancement plan,” said Donald. “At a cost per berth in line with our existing order book, these new ships will enhance the return profile of our fleet. These are exceptionally efficient ships with incredible cabins and public spaces featuring a design inspired by Micky Arison and Michael Thamm and developed by our new build teams.”
Arison is chairman of the board of directors for Carnival Corporation & plc and Thamm is CEO of the Costa Group, which includes AIDA Cruises and Costa Cruises.
Bernard Meyer, CEO of Meyer Werft, said: “In past years, we have built seven highly successful ships for AIDA Cruises. We are honored that Carnival Corporation has entrusted us with the implementation of this ambitious shipbuilding program, and we look forward to building these four magnificent ships.”
Carnival believes that the new ship order will allow the Costa Group to continue to build on its leadership position in the European cruise market.
Source: worldmaritimenews